WhiteDesert Power Projects
HomeAboutServicesProductsProjectsBlogSafetyContact
WhiteDesert Power Projects

Powering a sustainable future with clean, renewable energy. Turnkey solar EPC for industry, commerce and utility-scale projects across India.

Our Services

  • Solar Project Development
  • Engineering & System Design
  • Construction & Installation
  • Operations & Maintenance (O&M)
  • Financing & Subsidy Assistance
  • Procurement of Quality Components
  • Performance Monitoring

Company

  • About us
  • Our Projects
  • Safety Policy
  • Blog
  • Contact Us
  • Privacy Policy
  • Terms & Conditions

Let's connect

  • R.N.Complex, Bhuj - Nakhatrana Highway, Nana Angiya Patiya, Nana Angiya, Nakhatrana, Gujarat, 370675
  • +91 78599 82323
  • wdplmarket@gmail.com
  • Mon–Fri 9am–6pm
Chat on WhatsApp

© 2026 WhiteDesert Power Projects Pvt Ltd. All rights reserved.

Solar Powering Your Savings · Save up to 90% on Electricity Bills

HomeServices
What We Deliver

Solar EPC services, end-to-end and in-house.

From the first site survey to long-term plant performance, our seven specialised practices cover every stage of the solar lifecycle.

What We Do

SolarEPCservices,end-to-endandin-house

From feasibility studies to long-term performance monitoring, we cover every stage of the solar EPC lifecycle without sub-contracting the critical work.

Solar Project Development
Service · 01

Solar Project Development

From feasibility and site surveys to commissioning, our solar project developers plan and execute every stage in-house. We turn ideas into revenue-generating plants with detailed techno-commercial analysis, structured timelines and accountable, end-to-end turnkey delivery.

Engineering & System Design
Service · 02

Engineering & System Design

Future-ready PV system design backed by load analysis, layouts and 3D modeling. Our engineering team sizes every component for your load profile, optimises energy yield and builds practical, bankable designs that perform reliably across their full operational life.

Construction & Installation
Service · 03

Construction & Installation

Rooftop and ground-mounted plant installation executed with precision by certified in-house crews. We maintain strict HSE, civil and electrical standards, keep workflows efficient on site and deliver structured, on-time construction for commercial and utility-scale projects.

Operations & Maintenance (O&M)
Service · 04

Operations & Maintenance (O&M)

Comprehensive O&M with preventive servicing, troubleshooting and performance optimisation. We provide 24×7 remote monitoring, scheduled cleaning, rapid fault resolution and availability guarantees that protect plant output and the long-term return on your solar asset.

Financing & Subsidy Assistance
Service · 05

Financing & Subsidy Assistance

End-to-end loan support and subsidy facilitation under PM Surya Ghar, DREBP and PM-KUSUM. Our team handles documentation, DISCOM coordination and bankability, making solar adoption affordable for homes, businesses and industry with minimal upfront burden.

Procurement of Quality Components
Service · 06

Procurement of Quality Components

Verified sourcing of MNRE-approved panels, inverters, BOS and mounting structures at optimised cost. We secure reliable supply chains, vet every component for quality and durability, and protect long-term plant value with premium, performance-graded materials.

Performance Monitoring
Service · 07

Performance Monitoring

24×7 performance monitoring, analytics and long-term assurance after commissioning. We track generation hour by hour, flag underperformance early and continuously optimise output, delivering transparent reporting and dependable energy yield for the life of the plant.

Industries We Serve

Solar EPC for every operational scale

Whether it's a 1 kW retail rooftop or a 300 MW utility-scale park, our delivery model adapts to your industry's load profile, compliance needs and operating risk.

Manufacturing

Process plants, heavy industry, foundries.

Textile

Spinning mills, dyeing units, weaving.

Warehouses & Logistics

Large-roof, low-occupancy ideal for rooftop solar.

Hospitals

Reliable 24×7 power with battery backup integration.

Schools & Institutions

Campuses, universities and research centres.

Commercial Buildings

Malls, hotels, IT parks, office towers.

Agriculture

PM-KUSUM solar pumps, agri-PV, cold storage.

Government & Utility

PSU partnerships, RE parks, EPC for utilities.

Frequently Asked Questions

Everythingyoumightwanttoaskbeforereachingout

If you don't see your question below, the contact form goes straight to our engineering team.

Solar EPC stands for Engineering, Procurement & Construction. WhiteDesert handles the entire lifecycle of a solar project — feasibility studies, system design, sourcing of MNRE-approved components, civil and electrical installation, DISCOM coordination, commissioning, and long-term O&M.

For commercial rooftop projects (50 kW–1 MW) we typically deliver in 30–60 days. Industrial and utility-scale ground-mounted projects (1–10 MW) range from 90–180 days depending on site conditions, DISCOM approvals and equipment lead times.

Residential rooftop systems qualify for the PM Surya Ghar scheme (up to ₹78,000). Agricultural pumps qualify under PM-KUSUM. Gujarat-based commercial and industrial projects can access DREBP support. Our financing team handles documentation end-to-end.

For most industrial clients on commercial tariffs, payback ranges between 3.5 and 5 years. After that, the system generates near-zero-cost electricity for 20+ years of its operational life — a 15–18% IRR on most assets.

Yes — we coordinate every regulatory step including state-utility liaisoning, net-metering applications, single-line diagram approvals, CEIG inspection, safety certification and final synchronisation.

We offer comprehensive O&M contracts with monthly performance reports, 24×7 remote monitoring, preventive cleaning schedules, and a 95%+ availability guarantee. Component warranties follow OEM standards (12 yrs product / 25 yrs performance for panels).

Yes — we have delivered turnkey solar + Battery Energy Storage projects for clients like GIPCL. BESS integration is sized based on load patterns, peak demand, and time-of-day tariff structures.
Join the renewable energy movement

Power your future with clean solar energy.

Discover sustainable solutions that reduce costs and environmental impact. Take the first step today.

Let's connect
For a green future
wdplmarket@gmail.com
Mon–Fri 9am–6pm
+91 78599 82323
WhatsApp or call