WhiteDesert Power Projects
HomeAboutServicesProductsProjectsBlogSafetyContact
WhiteDesert Power Projects

Powering a sustainable future with clean, renewable energy. Turnkey solar EPC for industry, commerce and utility-scale projects across India.

Our Services

  • Solar Project Development
  • Engineering & System Design
  • Construction & Installation
  • Operations & Maintenance (O&M)
  • Financing & Subsidy Assistance
  • Procurement of Quality Components
  • Performance Monitoring

Company

  • About us
  • Our Projects
  • Safety Policy
  • Blog
  • Contact Us
  • Privacy Policy
  • Terms & Conditions

Let's connect

  • R.N.Complex, Bhuj - Nakhatrana Highway, Nana Angiya Patiya, Nana Angiya, Nakhatrana, Gujarat, 370675
  • +91 78599 82323
  • wdplmarket@gmail.com
  • Mon–Fri 9am–6pm
Chat on WhatsApp

© 2026 WhiteDesert Power Projects Pvt Ltd. All rights reserved.

Solar Powering Your Savings · Save up to 90% on Electricity Bills

Solar EPC Solutions · Since 2005

Solar EPC Solutions
for a Sustainable Tomorrow.

Engineering, Procurement & Construction solutions delivering reliable, scalable and efficient solar power systems for businesses and industries.

MNRE EmpanelledZero-Accident24×7 Monitoring
◆Unlock secure solar investments in Gujarat through DREBP and PM-KUSUM.◆Switch to rooftop solar under PM Surya Ghar and receive subsidies up to ₹78,000 for your home.◆Unlock secure solar investments in Gujarat through DREBP and PM-KUSUM.◆Switch to rooftop solar under PM Surya Ghar and receive subsidies up to ₹78,000 for your home.◆Unlock secure solar investments in Gujarat through DREBP and PM-KUSUM.◆Switch to rooftop solar under PM Surya Ghar and receive subsidies up to ₹78,000 for your home.
◆Unlock secure solar investments in Gujarat through DREBP and PM-KUSUM.◆Switch to rooftop solar under PM Surya Ghar and receive subsidies up to ₹78,000 for your home.◆Unlock secure solar investments in Gujarat through DREBP and PM-KUSUM.◆Switch to rooftop solar under PM Surya Ghar and receive subsidies up to ₹78,000 for your home.◆Unlock secure solar investments in Gujarat through DREBP and PM-KUSUM.◆Switch to rooftop solar under PM Surya Ghar and receive subsidies up to ₹78,000 for your home.
Solar installation crew on a project site
20+

Years of Solar EPC

Trusted across India

☀ Sustainable
About us

Transforming the Future of Energy with a leading Solar EPC Company

A leading Solar EPC company in India delivering efficient solar solutions for residential, commercial, industrial, and large-scale projects. Experienced solar project developers design and execute reliable systems focused on long-term performance and energy efficiency.

Structured turnkey solar solutions support clean energy adoption and cost savings through dependable execution.

0+
Projects Completed
0k+
Solar Panels Installed
0%
Client reference ratio
0+
Years Industry Experience
Our Process

From concept to commissioning, in seven precise stages.

A repeatable engineering methodology that scales from rooftop installations to 300 MW utility-scale parks.

  • Step 01

    Consultation

    Initial engagement to understand load profile, site, budget and timelines.

  • Step 02

    Site Survey

    Detailed site survey with shading analysis, structural review and yield estimate.

  • Step 03

    Engineering Design

    Tier-1 PV system design, electrical SLDs, civil drawings and bankable documentation.

  • Step 04

    Procurement

    Sourcing of MNRE-approved panels, inverters and BOS from verified suppliers.

  • Step 05

    Installation

    Certified installation crews execute civil, structural and electrical works to spec.

  • Step 06

    Commissioning

    Testing, DISCOM coordination, net-metering and energising the plant.

  • Step 07

    Maintenance

    24×7 monitoring, preventive cleaning and rapid-response O&M for the plant lifetime.

What We Do

SolarEPCservices,end-to-endandin-house

From feasibility studies to long-term performance monitoring, we cover every stage of the solar EPC lifecycle without sub-contracting the critical work.

Solar Project Development
Service · 01

Solar Project Development

From feasibility and site surveys to commissioning, our solar project developers plan and execute every stage in-house. We turn ideas into revenue-generating plants with detailed techno-commercial analysis, structured timelines and accountable, end-to-end turnkey delivery.

Engineering & System Design
Service · 02

Engineering & System Design

Future-ready PV system design backed by load analysis, layouts and 3D modeling. Our engineering team sizes every component for your load profile, optimises energy yield and builds practical, bankable designs that perform reliably across their full operational life.

Construction & Installation
Service · 03

Construction & Installation

Rooftop and ground-mounted plant installation executed with precision by certified in-house crews. We maintain strict HSE, civil and electrical standards, keep workflows efficient on site and deliver structured, on-time construction for commercial and utility-scale projects.

Operations & Maintenance (O&M)
Service · 04

Operations & Maintenance (O&M)

Comprehensive O&M with preventive servicing, troubleshooting and performance optimisation. We provide 24×7 remote monitoring, scheduled cleaning, rapid fault resolution and availability guarantees that protect plant output and the long-term return on your solar asset.

Financing & Subsidy Assistance
Service · 05

Financing & Subsidy Assistance

End-to-end loan support and subsidy facilitation under PM Surya Ghar, DREBP and PM-KUSUM. Our team handles documentation, DISCOM coordination and bankability, making solar adoption affordable for homes, businesses and industry with minimal upfront burden.

Procurement of Quality Components
Service · 06

Procurement of Quality Components

Verified sourcing of MNRE-approved panels, inverters, BOS and mounting structures at optimised cost. We secure reliable supply chains, vet every component for quality and durability, and protect long-term plant value with premium, performance-graded materials.

Performance Monitoring
Service · 07

Performance Monitoring

24×7 performance monitoring, analytics and long-term assurance after commissioning. We track generation hour by hour, flag underperformance early and continuously optimise output, delivering transparent reporting and dependable energy yield for the life of the plant.

Featured Projects

Real-world solar EPC delivery, megawatt by megawatt.

From rooftop installations to 300 MW utility-scale parks, our project portfolio spans the full scale of Indian solar.

Shree Ram Kaolin
1 MW

Shree Ram Kaolin

Kutch, Gujarat

Turnkey · Ground Mounted Seasonal Tilt

Aditi Packaging
3 MW
Aditi Packaging
Kutch, Gujarat
RE Park, Khavda
300 MW
RE Park, Khavda
Kutch, Gujarat
GIPCL
Turnkey
GIPCL
Kutch, Gujarat
Why Choose Us

Thereliabilitymetricsindustrialclientstrust

Six concrete reasons WhiteDesert is the EPC partner for businesses that can't afford solar to be an experiment.

Tier-1

Tier-1 Engineering

MNRE-empanelled practices, bankable documentation, IEC/IS compliance.

0 Subs

In-house EPC Crews

No sub-contractors on critical work. Certified, trained, repeated.

<5 yrs

3.5–5 Yr Payback

Industrial clients typically achieve full payback well under five years.

0 incidents

Zero-Accident Record

Strict HSE protocols protect workforce and stakeholders alike.

95%+

95%+ Plant Availability

Guaranteed uptime backed by predictive O&M and live monitoring.

1 partner

End-to-End Accountability

Single partner from feasibility to 25-year performance assurance.

Client Testimonials

Trustedbyindustriesthatdemandreliability

A few words from the operations leaders, project managers and directors who have partnered with WhiteDesert.

“WhiteDesert delivered our 4 MW solar plant on schedule with zero safety incidents. Their engineering team understood our load profile better than we did — and the savings on our electricity bills started showing from month one.”

S
Operations Head
Shree Ram Kaolin · Kutch, Gujarat
Industries We Serve

SolarEPCforeveryoperationalscale

Whether it's a 1 kW retail rooftop or a 300 MW utility-scale park, our delivery model adapts to your industry's load profile, compliance needs and operating risk.

Manufacturing

Process plants, heavy industry, foundries.

Textile

Spinning mills, dyeing units, weaving.

Warehouses & Logistics

Large-roof, low-occupancy ideal for rooftop solar.

Hospitals

Reliable 24×7 power with battery backup integration.

Schools & Institutions

Campuses, universities and research centres.

Commercial Buildings

Malls, hotels, IT parks, office towers.

Agriculture

PM-KUSUM solar pumps, agri-PV, cold storage.

Government & Utility

PSU partnerships, RE parks, EPC for utilities.

Our Blogs

Stayupdatedwiththelatesttrends&industryinsights

Practical guides and updates on solar EPC, subsidies, performance and sustainable energy adoption across India.

One Partner for Construction, Procurement, and Financing: How a Kutch Solar Project Stays on Track
Insight · 01
28 November 2026

One Partner for Construction, Procurement, and Financing: How a Kutch Solar Project Stays on Track

Plan Kutch solar installation with 2026 costs, subsidies, financing options and project timelines.

Read article
Solar EPC in Kutch: What End-to-End Solar Project Delivery Actually Involves
Insight · 02
24 November 2026

Solar EPC in Kutch: What End-to-End Solar Project Delivery Actually Involves

Understand solar EPC in Kutch, including costs, approvals, timelines and contractor selection.

Read article
Solar Installation in Nakhatrana: The Process from First Enquiry to Switch-On
Insight · 03
21 November 2026

Solar Installation in Nakhatrana: The Process from First Enquiry to Switch-On

Explore Nakhatrana solar costs, subsidies, net metering, installation timelines and installer selection.

Read article
Frequently Asked Questions

Everythingyoumightwanttoaskbeforereachingout

If you don't see your question below, the contact form goes straight to our engineering team.

Solar EPC stands for Engineering, Procurement & Construction. WhiteDesert handles the entire lifecycle of a solar project — feasibility studies, system design, sourcing of MNRE-approved components, civil and electrical installation, DISCOM coordination, commissioning, and long-term O&M.

For commercial rooftop projects (50 kW–1 MW) we typically deliver in 30–60 days. Industrial and utility-scale ground-mounted projects (1–10 MW) range from 90–180 days depending on site conditions, DISCOM approvals and equipment lead times.

Residential rooftop systems qualify for the PM Surya Ghar scheme (up to ₹78,000). Agricultural pumps qualify under PM-KUSUM. Gujarat-based commercial and industrial projects can access DREBP support. Our financing team handles documentation end-to-end.

For most industrial clients on commercial tariffs, payback ranges between 3.5 and 5 years. After that, the system generates near-zero-cost electricity for 20+ years of its operational life — a 15–18% IRR on most assets.

Yes — we coordinate every regulatory step including state-utility liaisoning, net-metering applications, single-line diagram approvals, CEIG inspection, safety certification and final synchronisation.

We offer comprehensive O&M contracts with monthly performance reports, 24×7 remote monitoring, preventive cleaning schedules, and a 95%+ availability guarantee. Component warranties follow OEM standards (12 yrs product / 25 yrs performance for panels).

Yes — we have delivered turnkey solar + Battery Energy Storage projects for clients like GIPCL. BESS integration is sized based on load patterns, peak demand, and time-of-day tariff structures.
Join the renewable energy movement

Power your future with clean solar energy.

Discover sustainable solutions that reduce costs and environmental impact. Take the first step today.

Let's connect
For a green future
wdplmarket@gmail.com
Mon–Fri 9am–6pm
+91 78599 82323
WhatsApp or call